Latest News

Renewable energy sources

 


Technomash BIG JSC starts the construction of photovoltaic park near Sliven

The terrain with total area of 93 decares, is located in the Thracian lowlands, where are typical the open areas with low horizons and absence of shading by mountains or hill in south direction.

The whole free area is possible to be utilized for installation of PV modules and it is possible to build a photovoltaic power plant with capacity of 4,784 MWp.

The location, the plain land and the orientation of the area allow easy construction and easy maintenance of photovoltaic park with high capacity. 

The construction permit is already obtained, as well as the final contract for grid connection to the Electricity Distribution Grid. The construction of the plant is expected be completed by November 2011.

The assessment of the solar potential in this position for construction of photovoltaic park is made on the basis of on-ground meteorological information for the region during the period 1981-2002, as well as on the basis of satellite information by the European satellite program - HelioClim.

The astronomical coordinates show that the optimal angle of 35-36° for inclination of the active surface of the solar generator towards the horizon.
The average annual amount of solar radiation reaching the land surface on a horizontal plain is 1365 kWh/m2, and in the modules plain 1463 kWh/m2. The average annual daily environment temperature in the area reaches 13.5 °С .

The global warming during the last years moves the peak values of environment temperature to 42-45 °С during the summer months.

In particular, having in mind the local climate during the winter season, it is deemed that using of tracking systems is not suitable because of the high risk factor. For the planned PV installation the most appropriate arrangement of the PV modules in on fixed (static) constructions with active surface inclined to the South.

The preliminary computer modeling of the solar generator behavior shows that the predicted annual energy yield supplied to the electricity system at the set climate conditions should exceed 3451 MWh/per annum.

The specifics of the activities in the region of the investment are favorable for the preservation of the fauna. These activities do not involve any impacts which would cause damages on the populations of the species and formed zoocoenosis.

The activities for the installation construction include only unpacking and installation of light details without wet processes. They do not require working area and cannot be source of pollution for neighbor areas. The building of technological roads is not required because there is such road reaching the area borders. Because of the relatively short time for construction there are not expected heavy technical pollution – oils and aerosols, causing serious and permanent damages of habitats. The location of the project, the contents of the flora and the specific activities do not suppose fragmentation pf animal species populations. This is why there is no reasonable cause for disturbance of animals or birds or for short term stressing factors.

 
Wind Turbine
 
Ветрогенератори - Проектиране, доставка, изграждане, финансиране, управление, нормативни документи
 
Design, delivery, construction, financing, management, normative documents …
More info
 
 
Photovoltaics
 
Фотоволтаици - Проектиране, доставка, изграждане, финансиране, управление, нормативни документи
 
Design, delivery, construction, financing, management, normative documents …
More info
 
 
Projects
 
 
Our success has no secrets. It is due to our striving for producing …
More info
 

Copyright © Technomash JSC