The activities
which we offer for preliminary research and
project design of photovoltaic systems, include:
 |
Carrying out of solar
energy audit as a part of the
preliminary project research. The audit
is based on methodology, which involves
using of statistical data from
meteorological observations, satellite
data and local assessment of the plot.
On this basis are modeled the average
monthly and annual amount of solar
energy per area unit. Assessment of
existent infrastructure is prepared, as
well as analysis of profit at the
possible technical solution for the
particular terrain. |
 |
On the basis of the
particular conditions of the place, a
suggestion for solar generator is made
with the necessary capacity and optimal
choice of photovoltaic. |
 |
Preparation of
preliminary project for the electrical
scheme of the photovoltaic system,
connected to medium voltage electrical
grid. The preliminary project is the
basis for the work project and for
presentation of the investment to
financial and administrative
institutions. |
|
|
 |
The assessment of the
expected electrical energy yield, which
as methods includes: examination of two
technological options, optimization of
each option for solar generator,
inverter and electric connection scheme
at particular technical characteristics
of modules and inverter; conclusion for
expected production, number of the
module, type of connection. |
 |
Assessment of the
economical indexes and the period for
return of investments |
 |
Research for the
conditions for grid interconnection in
the relevant Electricity Distributing
Company (EDC) |
 |
Work project,
including geological reports, geodesic,
architecture, construction and
electro-technical part, type of
connection to the grid, acquiring of
necessary permits |
 |
Signing of contract
for interconnection to the EDC. |
|
|