For most accurate selection
the three-dimensional analysis is applied,
because it is necessary to account for the most
optimal concurrence between the wind range and
the highest efficiency of the relevant turbine
for this wind range.
This data is necessary for determination of the
efficiency of the selected location – this is
the base for determining the quantity of
produced energy for one year and the actual
prime cost of the energy per 1 kW.
When designing a wind park, except for the
technical characteristics of the relevant
turbines, different interdependence factors are
taken into consideration in order to determine
the type, number and the exact location of each
of them. This is only one of the steps for
calculation of the possibilities for optimal
return of the investment and consequently for
all components and approaches for preparation,
financing and realization of the relevant
project.
The parameters of the project are defined
according to the purposes for which the
generated energy shall be used, if it would be
necessary reservation of the electricity supply
by another energy source and other factors.
A basic component is the equipment for
transformation of the wind force in energy –
wind turbine generator. Of significant
importance is the selection of optimal capacity
of each equipment, as well as the most
appropriate producer. A preliminary Plan of the
working process is prepared according to the
type of the equipment, the number, availability
and delivery conditions, which is necessary for
planning and assuring special teams, equipment
and logistics for the installation.
Parts of the whole design are the architectural,
construction, electro-technical and geodesic
plans. TECHNOMASH works with the most competent
and experienced professionals in these areas,
with which help the completed project design is
perfectly coordinated and troubles, due to
discrepancies or absences during the completion
of the project are reduced to zero.
The wind energy projects cannot be started
without preliminary acquired permits and
preliminary contracts. This process may be too
long, because of the administrative particulars
and obstacles, which are time-consuming
disturbing for the investor. In TECHNOMASH we
are perfectly aware with the entire process and
the particulars in regard with the acquiring of
the relevant documents and this service is
particularly appreciated by our clients.
According to our clients’ wish, we can provide
comprehensive consultations.
|